Case In Point

Gulftainer, UAE, 2010
The port decided to upgrade the control and drive system on its QCs

  • Crane was built in 1978
  • DC motor was overhauled
  • Refurbishment in Electrical Room
    1. Main hoist/gantry DC drive panel
    2. Trolley/boom DC drive panel
    3. Master controller PLC panel
    4. Auxiliary control panel
    5. Crane Management System
  • Refurbishment in Machinery House
    1. Medium voltage transformer
    2. Switchgear
    3. Power Factor Correction/Harmonic Filter panel
    4. Thruster Disc brake
  • Other refurbishments
    1. Operator consoles and Cabin control panel
    2. Load Cell
    3. Cable Reel
    4. Festoon System
    5. Crane Management System